Previous Entry Share
a month of missed entries. 88 hrs
kellystevens

So I have been vacationing or staycationing, trying to get a bunch done. Limited success. But in images, some updating.

The vans supplied hardware for the throttle linkage.

The kelly fabricated linkage all hooked up.

Mixture linkage

Bell crank for mixture linkage

Throttle linkage

Fireproof sleeve hoses to and from fuel transducerBad image sorry

Prop governor linkage attached, had to fabricate small piece to allow room to get linakage attached to arm.

Lots of adel clamps

Some baffling work.

Fuel hose to throttle body from fuel transducer.

Fabricated piece for back of baffling.


?

Log in

No account? Create an account